馃寪 English

Submit Article

Reflective Hot Melt Road Marking Paint

AASHTO M249-98(USA) Reflective Hot Melt Road Marking Paint

Product Details

1

Definition of hot melt paintings

Thermoplastic Road Marking Paint material is a 100% solid, environmental friendly, and for people safe compound containing binders, pigments, fillers, and glass beads that liquefy when heated. The glass beads provide sustained, bright nighttime reflectivity; the pigments provide color and opacity; the fillers (such as calcium carbonate) increase volume; and the binder, composed of plasticizers and resins, provides toughness, flexibility, and bond strength, while holding all components together.

2

Common problems with Thermoplastic road markings

✅Adhesion: Overall detachment, mostly due to improper construction; lack of asphalt on the detached surface indicates insufficient adhesion. Abrasion: The top is eroded by abrasives and weathering; insufficient thickness accelerates wear.

✅Scraping: Caused by snowplows; commonly seen at the leading edge of dashed lines; can be reduced through proper operation.

✅Cracking: Mostly due to road surface cracking or temperature stress; excessive cracking on new standards requires checking the material formulation.

✅Blistering: Pores exceeding 1/4 inch, caused by moisture, solvent residue, or improper primer application.

✅Thickness: Below the 2.3 mm standard, shortens lifespan; touch-up requires removing glass beads.

✅Reflectivity: Initial loss is due to improper glass bead embedding; performance degradation is related to the paint and glass beads.

3

Thermoplastic road marking paint consists of resin,EVA,PE wax ,fillers materials,glass bead and so on. It is powder condition at normal temperature,when heated to 180-200 degrees by hydraulic cylinder pre-heater, it will appears flow, use the road marking machine to scrape the paint to the road surface will form hard film,It has full line type,strong wearing resistance , Spray reflecting micro glass beads on the surface under construction, it has good reflecting effect at night , it is widely applied in highway and city road, According to the environment used and the different construction requirements,we can supply different types of paint for our customer option.

4

5

Core Requirements for Correct Application of Hot-Melt Road Markings

The failure of hot-melt road marking adhesion can be controlled through standardized construction. The core requirements are thorough on-site inspection and adherence to the following key aspects to ensure installation performance:

✅1、Marking Location: Apply directly to the lane lines, at least 5 cm away from the shoulder and construction joints. Avoid applying above the joints between the driving lane and shoulder, and longitudinal joints between lanes. 

✅2、Equipment Management: Daily inspections ensure operability and compliance with specifications, maintaining cleanliness and freedom from residue buildup.

✅3、Material Control: Materials must be inspected and approved, bearing batch numbers and clear markings (resin type, application method).

✅4、Road Surface Conditions: The road surface must be clean, dust-free, and dry, with old markings, maintenance compounds, and accumulated debris removed. During construction, the air and road surface temperature should not be lower than 10°C. Work must be stopped if the road surface humidity is too high.

✅5、Air Temperature:Wind chill can affect the adhesion strength of the strip applicator when the air temperature drops below 18°C.

✅6、Primer Application:Use the primer approved by the paint manufacturer, apply according to the recommended coverage rate, and allow it to cure/evaporate before applying the markings.

6

Our advantages:

✅Reflective

✅Strong Adhension Power and Durability

✅High Dirty Pick-up Resistance

✅High Usage Ratio and Save Cost of Gas

✅Not Fade Easily

✅Customizable


Product Specification

ApplicationMarking on the road surface as the guide
BrandHENGYUE
TypeThermoplastic powder paint
IngredientC5 Petropols, EVA, PE wax, titanium dioxide, glass beads
Touch/ Full Dry Time After Marking3/10 mins
Heating Temperature180-200°C
Shelf Life12 months
Weight25kg/bag

 

Effect display

111

222

333


×

Get a Quote

Please fill out the form below, and our professional team will contact you within 24 hours.